Parramatta Light Rail opens – marking a new era of public transport inWestern Sydney

Greater Parramatta is better connected than ever before with the new L4 Westmead &
Carlingford Line opening today through the Parramatta CBD in a significant moment in NSW
transport history.


From 5am this morning, passengers started boarding modern and comfortable airconditioned
light rail vehicles on the new 12-kilometre network, with frequent and reliable
services across 16 accessible stops.


The opening passenger service saw three light rail vehicles commence concurrently from
the Westmead and Carlingford light rail stops at 5:00am, and Parramatta Square at 5:02am.


The L4 line will launch to a weekday timetable, with initial services every 9 minutes between
7am to 7pm; every 12 minutes between 5am and 7am and 7pm and 11pm; and every 16
minutes between 11pm to 1am.


The 13 new 45-metre-long light rail vehicles can each move up to 400 people, making it
easier for residents and visitors to connect to and move through Sydney’s second CBD.


The new light rail line provides connections to key destinations, including the Westmead
Health Precinct, CommBank Stadium, Riverside Theatres, over 60 cafes and restaurants on
and around Church Street, Parramatta Square, Rosehill Gardens Racecourse, and three
Western Sydney University campuses.


The L4 Line is part of the Transport Opal network – passengers can tap on and off at Opal
readers located at each light rail stop, with ticket machines at Westmead Hospital,
Childrens Hospital and Ngara stops.


Passengers can plan their trips by visiting transportnsw.info or the Opal Travel App.


Over the coming weeks, additional staff will be placed at each stop to support passengers
as they become familiar with the new service.

Audio help points are also located at each stop which connect directly to staff at
Parramatta Light Rail’s Operations Control Centre.


Parramatta Light Rail is the first light rail project in the State to deliver ‘green track’,
incorporating it with wire-free technology, in park lands and heritage-sensitive
environments along 1.3kms of the alignment. The award-winning ‘green track’ design used
81 per cent less concrete in its construction, reduces noise and urban heat, and delivers
environmental and health benefits.


Additionally, a new 5.7km walking and bike riding path between Carlingford and Parramatta
opened to the public in May 2023 as part of the project, providing residents and visitors with
more active transport options. Cyclists will benefit from 160 new bike hoops located near
the majority of the light rail stops across the alignment, with the trams equipped with four
bike spots.


Parramatta Light Rail has converted the former single-track T6 Carlingford Line between
Camellia and Carlingford, which ran two train services per hour and stopped 70,000 drivers
each day at the historic level crossing on Parramatta Road, Granville to dual-track light rail.


This will provide residents with more frequent services and better connections to town
centres, including Parramatta and the Sydney CBD.


With the Parramatta Light Rail now operational, bus routes 535 which ran along the
Carlingford to Parramatta alignment during construction and testing, and the 900
Parramatta shuttle bus will be withdrawn from service.


By 2026, around 22,000 people are expected to use Parramatta Light Rail every day, with an
estimated 130,000 people living within walking distance of the 16 light rail stops.


Parramatta Light Rail was delivered by Ford Civil, Ventia, Diona Ward Joint Venture,
Parramatta Connect (CPB Contractors and Downer Joint Venture), Great River City Light Rail
consortium (Transdev and CAF Rail Australia), and their subcontractors.


In the 2024-25 Budget, the Minns Labor Government committed $2.1 billion to Parramatta
Light Rail Stage 2 to extend Stage 1 and further connect growing communities in Western
Sydney between Ermington, Melrose Park, Parramatta, and Olympic Park.


Early works commenced this month on the Parramatta Light Rail Stage 2 Enabling Works
project to deliver the first 1.3km light rail alignment. This will include a 320m public and
active transport bridge between Wentworth Point and Melrose Park. Major bridge
construction is expected to commence in 2025.


The Parramatta Light Rail stages 1 and 2 network from Westmead to Sydney Olympic Park
will support the Greater Parramatta and Olympic Peninsula (GPOP) priority growth area, one
of Sydney’s fastest growing areas.


With GPOP’s population expected to exceed 277,000 by 2041, light rail will be critical to
serve this growing demand and connect residents to key employment hubs, entertainment,
and amenities


For more information, visit http://www.nsw.gov.au/parramatta-light-rail.

Deputy Premier and Minister for Western Sydney Prue Car said:


“The Minns Labor Government is committed to investing in transport in Western Sydney,
and now the people of Parramatta have light rail travelling on their streets again for the first
time in 80 years.


“We are focusing on delivering the essential services that Western Sydney needs most, and
that includes reliable public transport to reduce travel times and congestion for local
residents.


“The opening of this significant transport link is a big investment in the future of
Parramatta, and will soon become part of the daily routines of thousands of Parramatta
residents for generations to come.”


Minister for Transport Jo Haylen said:


“I want to thank and congratulate everyone who has been part of bringing this megaproject
to life in Sydney’s second CBD, Parramatta.


“This is the public transport network Western Sydney has been waiting for and will provide
economic and social benefits for years to come.


“By investing in projects like the Parramatta Light Rail, we’re helping our city grow around
key public transport links.


“The L4 will connect some of our fastest growing communities and premier destinations in
the area, making it easier for people to live, visit and work here.”


“I want to thank the more than 15,500 workers who have played a part in delivering this
important piece of transport history.”


Member for Parramatta Donna Davis MP said:


“Welcome Parramatta Light Rail! The new L4 Westmead & Carlingford Line is the first stage
of the Parramatta Light Rail. Stage 2 will extend this network to Sydney Olympic Park.


“It is an exciting time for Parramatta, we now have access to a modern and reliable light rail
service and new active transport links.


“Delivering a major infrastructure project in the heart of our historic city has been
challenging and I want to thank the local community for their patience.


“The big day has finally come Parramatta, enjoy!”


Transport for NSW Secretary Josh Murray said:


“While people become familiar with sharing the road with light rail, we urge everyone to be
careful and mindful when driving, riding a bike, or walking nearby.

“The trams are big and can’t swerve, so it is important that people keep an eye out for them,
and always stop, listen, and look around.


“There will be Customer Service Officers, along with street teams in red shirts, on the
ground, ready to answer questions about the new service.


“We’re asking people to plan ahead at transportnsw.info or via the Opal Travel app.”

Be the first to comment

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.